Apsley Hemel
A speculative purchase of a detached bungalow. It took 16-20 weeks to achieve planning for a new terrace of three 3 bed homes. The build took 50 weeks to complete construction.
SOME OF THE TASKS THAT WE SUCCESSFULLY COMPLETED DURING THE CONSTRUCTION:
- Removal and disposal of the existing bungalow trees and vegetation.
- Strip footing with block and beam flooring.
- Traditional cavity walls with Facing brickwork.
- Installation of large attic Truss roof.
- A busy road, where consideration needed to given to all the residents especially our immediate neighbours